Español

Specifications

V125TCDTV125EEDM
Typeby Timeby Meter
Service Flow34 GPM34 GPM
Backwash Flow32 GPM32 GPM
Drain connection¾” NPT¾” NPT
Brine connection⅜” or ½” OD⅜” or ½” OD
Distributor pipe32 mm OD32 mm OD
Meter flowN/A0.25-34 GPM
Meter rangeN/A0.02-5700 m3
TotalizerN/AYES
Tank’s Head2.5”2.5”

Accessories and parts for this product

Clack Motorized Alternating Valves

Clack No Hard Water Bypass

Clack Fittings & Accessories

More in Clack Control Valves

See all Clack Control Valves

Need a price or help choosing a part?

Tell us the part number or what you are trying to fix. We answer in English and Spanish and ship the same day from Pembroke Park, Florida.